Featured Projects

ON Line 500kV Transmission Line Project

Location: Eastern Nevada
The ON Line 500kV Transmission Line Project consists of 235 miles of 500kV transmission line construction in eastern Nevada.
VIEW PROJECT

   

Clover Substation Project

Location: Juab County, Utah
The Clover Substation Project consists of construction of a new substation, upgrades to existing substations and new transmission lines.
VIEW PROJECT

   

Sunrise Powerlink Project

Location: San Diego and Imperial Counties, California
K2 Environmental LLC provided additional support to Insignia Environmental on the Sunrise Powerlink Project in the preparation of submittal packages for the California Public Utilities Commission to obtain the Notice to Proceed (NTP) approval for all segments of the project.
VIEW PROJECT

   

Western Area Power Administration, O’Banion Elverta Natomas 230kV Transmission Line Project

Location: Sacramento, California
K2 Environmental LLC provided a full-time environmental coordinator to support Wilson Construction Company during the construction of this transmission line in the Sacramento area of California.
VIEW PROJECT

   

Southwest Intertie Project, Due Diligence Report

Location: Eastern Nevada
In anticipation of a merger between NV Energy and Great Basin Transmission to build a joint project through eastern Nevada, NV Energy contracted K2 Environmental LLC to conduct a due diligence review on all permits and agreements that had been acquired or developed for the project.
VIEW PROJECT

   

San Diego Gas & Electric Wood to Steel Replacement Project

Location: San Diego County
K2 Environmental LLC provided a full-time environmental coordinator to support the construction team during the replacement of wood poles in San Diego County.
VIEW PROJECT

   

Tehachapi Renewable Transmission Project (Segments 6 and 11)

Location: Southern California, Angeles National Forest
K2 Environmental LLC completed an extensive access analysis of Segments 6 and 11 on the Tehachapi Renewable Transmission Project on the Angeles National Forest.
VIEW PROJECT

   

Ely Energy Center-Right of Way Agent Services

Location: Nevada
K2 Environmental LLC provided a senior right-of-way agent to support the Lands Department in the acquisition of right-of-way for the Ely Energy Center Project.
VIEW PROJECT

   

Eastern Nevada Intertie Project

Location: Eastern Nevada
K2 Environmental LLC provided environmental support services for the Eastern Nevada Intertie Project.
VIEW PROJECT

   

Revegetation Services

Location: Eastern Nevada
K2 Environmental LLC has been conducting on-call revegetation services for NV Energy (dba Sierra Pacific Power Company) since 2005.
VIEW PROJECT

   

Chappel to Chimney Butte

Location: Wyoming
K2 Environmental LLC provided environmental support during the initial start up of this project.
VIEW PROJECT

   

Columbia-Ellensburg No. 1

Location: Ellensburg, Washington
K2 Environmental LLC worked with J.M. Ellett Construction to develop site-specific erosion control measures, including developing the exhibits that were eventually submitted to the Bureau of Land Management.
VIEW PROJECT

   

Right of Way Agent

Location: Nebraska
K2 Environmental LLC provided right of way support services to Nebraska Public Power District, responsibilities include assisting with landowner contact and claims settlements associated with refurbishment and tree removal work on NPPD power lines.
VIEW PROJECT

   

Tehachapi Renewable Transmission Project (Segments 1-3)

Location: Southern California
K2 Environmental LLC provided environmental support services for the Tehachapi Renewable Transmission Project (TRTP) for Segments 1 through 3 in southern California.
VIEW PROJECT

   

Home | Projects | Services | Who We Are | Contact

© Copyright 2012. K2 Environmental | Website Design & Development by GelFuzion, Inc.

K2 Environmental LLC | 2755 NW Crossing Drive, Suite 229 Bend, Or 97701
Phone: (541) 385-6028 / Email: info@k2-env.com