Location: Eastern Nevada
K2 Environmental LLC is providing a full-time environmental field team to support Sturgeon Electric Company during construction of 235 miles of 500kV electric transmission line in eastern Nevada. K2 is responsible for ensuring Sturgeon is meeting all their environmental requirements as set forth in the project permits and documents, particularly the Construction, Operation and Maintenance Plan. K2 is also responsible for developing all required plans and submittals related to environmental issues; these have included the Storm Water Pollution Prevention Plan, the Hazardous Materials Management Plan, the Emergency Response Plan, Blasting Plan and Dust Control Plan. In addition, K2 is responsible for the development of all deviation submittals required for changes to the project. Deviation submittals include the submittal of the completed form, maps depicting the change and associated Geographic Information System (GIS) shapefiles and metadata. K2 has also been responsible for mapping all project facilities including work areas, access roads and construction yards.