	<item>
		<title>San Diego Gas &amp; Electric Wood to Steel Pole Replacement</title>
		<description>

San Diego Gas &#38; Electric Company Tieline 683 Wood to Steel Pole Replacement

Sturgeon Electric Company

K2 Environmental LLC is working with Sturgeon Electric Company to provide environmental oversight on a 9-mile wood to steel pole 69 kV replacement project. The project is located in San Diego County, California and falls within SDG&#38;E's Natural ...</description>
		<link>http://www.k2-env.com/san-diego-gas-electric-wood-to-steel-pole-replacement/</link>
			</item>
	<item>
		<title>Tehachapi Renewable Transmission Project Segments 1-3</title>
		<description>
Tehachapi Renewable Transmission Project
(Segments 1-3)
PAR Electrical Contractors, Inc.

K2 Environmental LLC is providing environmental support services for the Tehachapi Renewable Transmission Project (TRTP) for Segments 1 through 3 in southern California. The TRTP will consist of over 250 miles of new and upgraded high-voltage transmission facilities. K2 is providing the following ...</description>
		<link>http://www.k2-env.com/tehachapi-renewable-transmission-project-segments-1-3/</link>
			</item>
	<item>
		<title>Tehachapi Renewable Transmission Project</title>
		<description>
Tehachapi Renewable Transmission Project
(Segments 6 and 11)
CH2M Hill

K2 Environmental LLC completed an extensive access analysis of Segments 6 and 11 on the Tehachapi Renewable Transmission Project on the Angeles National Forest. This analysis included looking at construction and environmental constraints related to access to each structure and ancillary area on ...</description>
		<link>http://www.k2-env.com/tehachapi-renewable-transmission-project/</link>
			</item>
	<item>
		<title>Chappel to Chimney Butte - Sturgeon Electric Construction Company</title>
		<description>Chappel to Chimney Butte
Sturgeon Electric Construction Company

K2 Environmental LLC provided environmental support during the initial start up of this project. A representative attending agency meetings and reviewed the project area for the contractor. K2 supported the fencing operation of cultural sites along the project area. </description>
		<link>http://www.k2-env.com/chappel-to-chimney-butte-sturgeon-electric-construction-company/</link>
			</item>
	<item>
		<title>Columbia-Ellensburg No. 1</title>
		<description>Columbia-Ellensburg No. 1
J.M. Ellett Construction

K2 Environmental LLC worked with J.M. Ellett Construction to develop site-specific erosion control measures, including developing the exhibits that were eventually submitted to the Bureau of Land Management for review and approval for the Columbia-Ellensburg No. 1 115-kV replacement project just north of Ellensburg, Washington. In ...</description>
		<link>http://www.k2-env.com/columbia-ellensburg-no-1/</link>
			</item>
	<item>
		<title>Ely Energy Center-Right of Way Agent Services</title>
		<description>Ely Energy Center-Right of Way Agent Services
Nevada Power Company


K2 Environmental LLC is providing a senior right-of-way agent to support the Lands Department in the acquisition of right-of-way for the Ely Energy Center Project. Our responsibilities on the project include landowner communications, survey coordination, strategic planning related to land use, private ...</description>
		<link>http://www.k2-env.com/ely-energy-center-right-of-way-agent-services/</link>
			</item>
	<item>
		<title>Eastern Nevada Intertie Project</title>
		<description>Eastern Nevada Intertie Project
Sierra Pacific Power Company
K2 Environmental LLC is providing environmental support services for the Eastern Nevada Intertie Project. K2 is providing the following support to the project: route analysis, substation siting, review of all ancillary areas, mapping and GPS data collection, coordination with resource specialists, and tree harvest ...</description>
		<link>http://www.k2-env.com/eastern-nevada-intertie-project/</link>
			</item>
	<item>
		<title>Revegetation Activites - Sierra Pacific Power Company</title>
		<description>



K2 Environmental LLC has been conducting on-call revegetation services for Sierra Pacific Power Company. This work includes reseeding of disturbed areas associated with project disturbance for various projects in Nevada. </description>
		<link>http://www.k2-env.com/revegitation-activites-sierra-pacific-power-company/</link>
			</item>
	<item>
		<title>Right of Way Agent</title>
		<description>Right of Way Agent
Nebraska Public Power District

K2 Environmental LLC provided right of way support services to Nebraska Public Power District, responsibilities include assisting with landowner contact and claims settlements associated with the ongoing refurbishment and tree removal work on NPPD power lines. Daily reports and forms are being provided as ...</description>
		<link>http://www.k2-env.com/right-of-way-agent/</link>
			</item>
	<item>
		<title>K2 Homepage</title>
		<description>

provides superior environmental management and inspection services. Our experienced staff follows a common sense approach to ensure our clients meet and exceed the environmental requirements for their projects.
No matter the size and scope of your project, K2 Environmental is dedicated to providing the right experience and best service possible to ...</description>
		<link>http://www.k2-env.com/k2-homepage/</link>
			</item>